bike breakfast - large print-page-001

Advertisements
Image | Posted on by | Leave a comment

2014 year in review!

Spokes Dunedin chair, Robert Thompson, provides a look back at 2014 as we dive into 2015
On the road again...

Site visit with the AA and council staff to review the layout on Portobello Road

In 2014, Dunedin continued pushing the boundaries of urban cycling in New Zealand, but there have been substantial growing pains as the city, and New Zealand at large, tries to figure out how to do cycling infrastructure.  The fine human specimens volunteering for Spokes Dunedin have once again done a great job with another busy year.  Some of the highlights include instigating an acceleration of the Portobello Road widening project; lots of site visits and meetings with council staff; working with the Harbourside Precinct group to find a viable solution to the Roberts/Wharf intersection; working with the AA, council staff, and affected property owners to find a better design for Portobello Road between Portsmouth Drive and Andy Bay Road; and representing Dunedin cyclists at the national Cycle Safety summits and at meetings with NZTA in Wellington.

IMG_6286

Around 75 people turned out for the first SPOKES Dunedin bike-in movie. We’re planning to do it again this summer!

2014 was a good year for Spokes love, with a bike-in movie by the harbour, wintertime bike raves (so on for winter 2015!), and a cruisy ride around town on World Car Free Day.

IMG_6543

SPOKES gets mad props

2014 also saw wide recognition for efforts at making Dunedin’s streets sweet for bikes.  Spokes Dunedin was awarded a 2014 Trustpower Community Award for Heritage and Environment for our efforts at making Dunedin a more human city and I was a finalist for the “New Zealand Cycle Champion” Cycle Friendly Award.  Our good friends at The Crooked Spoke DIY bike shop also picked up a Trustpower award, and Dunedin was a finalist in several categories of the Cycle Friendly Awards, with the Dunedin City Councillors bringing home the “Greatest commitment by a public body” award.

Harbourside and one-ways

IMG_6501

Accelerated completion of Portobello Road widening is looking good.

The most notable success of 2014 concerns the Portobello Road widening project.  Hundreds of Broad Bay and Portobello residents made annual plan submissions favouring completion of their end first, while hundreds more cyclists and other city residents favoured completion of the city end first.  With such broad desire to see the project complete, Spokes Dunedin and the Peninsula Board together suggested that the best solution would be to accelerate completion of the entire project.  Councillor Richard Thomson championed an investigation of this suggestion, which found that it is possible to complete the entire project within 3 years instead of 10, and save $3 million at the same time!

On the other side of the harbour, the shared path to Port Chalmers has received funding for the next design stage.  Construction hinges on the project gaining funding during the 2015-2018 NZTA funding cycle.  Fingers crossed!

Meanwhile on the one-ways, NZTA continues to work on the SH1 separated cycle lanes plan. The detailed options should be presented to Council by the middle of 2015.  We’ll be calling on you to speak out in support of this vital piece of urban cycling infrastructure when the time comes.  Be ready to be heard!

South Dunedin Strategic Cycle Network

IMG_0113[2]

The Royal Crescent path is cruisy, but still treats cyclists as second class citizens by requiring them to yield to side traffic.

Success on the South Dunedin Strategic Cycle Network has been a bit more miss than hit over the last year, having been plagued with some poor designs and some poor implementation.  The moderate successes to date include the much needed widening of the Portsmouth Drive shared path and the cycleway along Royal Crescent.  But Spokes was forced to formally submit against several of the DCC’s designs during various consultation stages, including designs for Victoria Road, Moreau St, and Musselburgh Rise.  Unfortunately, due to funding constraints, Victoria Rd and Musselburgh Rise (routes that actually need cycling infrastructure) have been dropped from the network altogether.

Many of the problems stemmed from a lack of early engagement, and an evident reliance on out of town consultants who didn’t seem to know much about Dunedin, or even cycling.  For example, while the cycleway idea for the Portsmouth Dr to Andy Bay Rd section of S. Portobello Rd is a great idea, the implementation was bad.  Had Spokes been given an opportunity to review the detailed design together with the AA, it’s possible we could have avoided the ongoing headaches there.  However, DCC is taking steps toward better engagement.  For example, the Harbourside Precinct Working Group of 2014 included representatives from Spokes, the AA, the police, fire and ambulance services, KiwiRail, and several business owners in the vicinity of the Roberts/Wharf intersection.  Although the group suffered some teething problems, in the end everyone was able to communicate their concerns and we were able to find a solution that everyone agreed to (which still has to be implemented).  This is the kind of model that should be pursued closer to the beginning of a project rather than at the end.  Spokes has now met together several times with DCC, the AA, and business/property owners along S. Portobello Road to investigate better solutions there, and a stakeholder liaison group is being established for the one-ways project that will begin meeting in January 2015.

IMG_0109[1]

Does this inspire you as an example of high-quality cycling infrastructure?

The initial failure of the Portsmouth Dr to Andy Bay Rd section should provide some valuable lessons about how to build cycling infrastructure.  Most importantly: cutting corners and trying to implement cycling infrastructure on the cheap could require costly remediation at a later date. We have repeatedly called for well-designed, high-quality, high-standard cycling infrastructure on fewer, but important, routes rather than widespread routes of poor quality or simply where it can be done most easily rather than where it is most needed.  The half measures on S. Portobello Rd and the patchwork quality of the widened Portsmouth Drive and Tahuna shared paths create confusion and leave people with the impression of a job half done.  We want every cycle route in Dunedin to be celebrated for its effectiveness for people on bikes, its quality of construction, and its ingenuity of design, and to serve as an inspiration for future work.

Spokes Dunedin takes it’s game national

IMG_6491

At the New Zealand Cycle Safety Summit in Wellington – investigating how to improve cycle safety for all NZ. Can you spot Olympic track cyclist Sarah Ulmer?

Following the coroner’s report last year, the government tasked NZTA with forming a panel of cycle safety experts to provide recommendations on how to strategically improve cycle safety in New Zealand.  Spokes Dunedin was invited to contribute to this process through a larger reference group that fed into the safety panel.  In preparation for the first NZ Cycle Safety Summit in April, comprising the entire panel and reference group, Spokes asked the people of Dunedin for input on what they thought were the issues facing cyclists, the ODT helped by publicizing it, and dozens of people responded.  Spokes Dunedin was the only organisation to ask for input from the public in this way!  The final 82 page report of recommendations to the government is now available.

On-Yer-Bike

Fantastic flyer for the Spokes-led nationwide GPS campaign, with awesome graphics by Generation Zero.

The Government Policy Statement (GPS) on Land Transport is the document that sets out funding levels for transportation, including a category for walking and cycling infrastructure.  Past funding levels for walking and cycling have been less than $20 million per year (for all of NZ!), compared with $1.5 billion per year for roads and motorways.  Spokes Dunedin initiated a submission campaign to ask for a very modest funding increase, and together with Cycle Action Auckland, Cycle Aware Wellington, and Generation Zero we mobilised over 3000 people from all across NZ to make a submission.

Government’s $100 million investment in urban cycling

Although our submission campaign did not achieve a GPS funding increase, it successfully elevated the national cycling profile. People in government, including the Prime Minister, are starting to appreciate the value of good cycling infrastructure, and during recent election campaigning all the major parties promised some kind of investment in urban cycling.  The government has now allocated $100 million to be spent over four years in addition to the regular allocation through the GPS.  To secure future funding and future increases in the GPS, it is crucial to demonstrate that this allocated funding can be successfully utilized within the 4-year timeframe, and to demonstrate that the outcomes are effective and of high quality.

Dunedin has a large number of cycling projects with local or regional council backing.  Several of these are already well advanced in their planning or implementation, including the Port Chalmers path, Portobello Road widening, SH1 separated lanes, and South Dunedin Strategic Cycle Network.  Because of this, Dunedin is very well positioned to benefit from the $100 million urban cycling fund, and I look forward to working hard in 2015 to ensure that Dunedin receives a fair share.

To sum up, the advanced state of our existing projects and the extra $100 million being provided by the government means that the next few years should bring real and significant change for cycling in Dunedin.  As a result of people like you speaking out for cycling, the past couple years have seen a lot of planning and a taste of what’s to come.   Here’s to making 2015 a year of on-the-ground change, and with your continued support we’ll make it happen.

Posted in All SPOKESd up, Infrastructure, Policy | 1 Comment

Roberts/Wharf St intersection: a model of community engagement

Today, the Otago Daily Times reports that business owners in the Harbourside area around Roberts and Kitchener Streets oppose a “proposed” cycle route along Wharf Street, and claim that there has been no consultation and they have not been listened to.

However, In June 2013 the DCC consulted on a proposal to completely close the Roberts/Wharf intersection, which was strongly opposed by businesses in the area. The DCC listened and went back to the drawing board. All the business owners in the area have known about this project for more than a year and have had the opportunity to be involved in the process.

The newly proposed changes are now being consulted on again, as was reported in the ODT two weeks ago. Consultation is ongoing even now and included letters delivered to businesses in the area, so to claim that businesses have not been consulted or didn’t know is disingenuous at best.

In fact, this time around the DCC has been the exemplar of community engagement. The newly proposed changes to the Roberts/Wharf St intersection were put together by a working party that initially included the owners of Dive Otago, Bodyline, Preens, and Otago Real Estate acting as representatives of businesses in the area, although the owners of both Preens and Bodyline declined to continue because of the time and effort required to be fully involved with roadwork planning. SPOKES Dunedin chair Robert Thompson acted as sole representation for cyclists, and there was additional representation from the AA, fire service, police, and KiwiRail.

This single intersection has quite possibly been the most consulted on road project the DCC has ever done!

In the ODT’s article both the businesses and the ODT itself have failed to recognize that this is not a proposal to build a cycleway along Wharf St. The cycleway is already there.  It has been there for years and hasn’t affected businesses. This proposal is about improving that existing cycleway by making the Roberts St intersection safer. Currently, the Roberts St crossing is actually wider than Wharf St itself, and the proposal is really a pretty modest change that would create two smaller crossings with a refuge island in the middle, rather than one massive crossing.

To be absolutely clear: The minor changes to access at this intersection have nothing to do with cyclists or the presence of a cycleway. Any access changes result from the fact that the intersection is behind a blind curve on a very busy, high speed road. Turning right out of that intersection is dangerous because you can’t actually see cars and trucks coming around the corner, it has nothing to do with cyclists.

It makes one wonder whether the proposed plans have actually been looked at or whether another anti-cyclist protest has been organized at the mention of the word “cycleway?” SPOKES Dunedin has heard that most of the people shown in the ODT’s photo are staff from a single business, so the latter does seem to be the case.

Posted in Infrastructure, Policy, Uncategorized | 1 Comment

St. Clair shared path: DCC would get better results through user engagement

Dunedin City Council seems to be facing yet another public relations disaster associated with the South Dunedin Strategic Cycle Network.  Targeted consultation on a proposed shared path along Victoria Rd is now open and it seems no one is particularly happy with the plan.  The proposal calls for a 3m wide “shared path” along the south side of Victoria Rd, entailing a widening of the southern footpath to 3m and removal of parking from the north side of Victoria Rd.  But to be clear, this is really just a 3m wide footpath where cyclists are legally allowed to ride and the question is “is this a good design?”

Late last year, NZTA held a public consultation about plans for a separated cycle lane on the State Highway 1 one-way pair in Dunedin.  They received more than 2000 submission, over 90% of which were supportive.  So why was NZTA so successful while the DCC continually has even the cyclists asking “is this any good?”

The short answer is engagement.  SPOKES representatives were fully engaged in developing the one-ways proposal and were able to ensure that what went out for consultation was a design that is both safe enough for everyone to use, and usable by even the strongest, most skilled cyclists.  The result was not only something that cyclists could rally to en masse, but something so visionary and inspired that many non-cyclists were moved to support it.

Unfortunately, when it comes to the DCC’s cycling projects, engagement with stakeholders/users has been a bit more miss than hit.  For the South Dunedin Strategic Cycle Network, not only has SPOKES and cyclist engagement been rather limited, but often our feedback has been wilfully ignored, as evidenced by the network plan consultation results from June 2013.

Victoria Rd isn’t the first misstep that is unappreciated by many:  closing half of the small stretch of Portobello Rd between Portsmouth Drive and the Andy Bay roundabout may be easy to do because there are few affected residences and businesses, but the outcome as it stands is confusing for both motorists and cyclists and seems like overkill.  Perhaps it isn’t finished yet?

SPOKES Dunedin has been pushing for separated lanes on primary routes as the gold standard because they are sorely needed in places like the one-ways, Andy Bay Rd, Portobello Rd, King Edward St, etc. But that doesn’t mean separated lanes are necessarily appropriate or possible on every street.  For example, while it may be a good idea to specially target areas around schools, we shouldn’t be spending our precious few cycling dollars building separated lanes on every low volume, low speed, residential street, such as Moreau Street.

The fact that new cycling infrastructure has to be retrofit into existing environments means that it often requires very careful thought and clever, often unique solutions tailored to each location. Out of town consultants don’t know Dunedin and often have little interest in the outcome.  SPOKES has been rejecting plan after plan coming from these consultants and the city keeps paying them to come up with more ill-conceived designs. At the same time we have one or two DCC transport staff who are super excited about cycling, are cyclists themselves, and really want to get the best outcome for the city. The council should invest a little bit of money on training up some of its own people rather than wasting large sums on consultants.

Victoria Road is one of those locations that requires a clever solution and needs to be thought of as a whole. This may be an area that is suitable for trying out a “shared space.” What would a shared space look like? Well, the esplanade is already a shared space that works well, so we could extend that treatment out onto Victoria Rd in the Forbury Rd area. Get rid of the designated footpaths and road markings, use pavers and street furniture to tell the story of the street. The street environment is ‘legible’ to everyone using it and is the most successful director of user behaviour, we just need to change how it reads.

DCC needs to step back and think carefully about the whole design philosophy.  It is great to consider the needs of the “interested but concerned” to encourage more people to cycle, but considering ONLY the needs of the “interested but concerned” will alienate existing cyclists.   If what is built is not of a sufficient standard to be used by existing cyclists they won’t use it, leading to further animosity from non-cyclists who will say “we spent all this money on this shared path and the damn cyclists don’t even use it.”  Building cycling infrastructure that cyclists won’t use may do more harm than good in terms of future funding.  The design philosophy should be “safe enough for kids, good enough for everybody.”

 

 

Posted in Infrastructure, Policy | 1 Comment

Take Action – Portobello Road (DCC Annual Plan)

The draft Annual Plan sets out the Dunedin City Council’s proposed annual budget for 2014/15.  Now is your chance to take action to make cycling on Portobello Road even more awesome in under two minutes!  As you may know, Portobello Road is slowly being widened, with footpaths and cycle lanes being added to improve pedestrian and cyclist access and safety.  Once complete, in 2023, Dunedin will have world-class cycling the entire length of our world-class Otago Peninsula.

Dunedin City Council is consulting on the order in which different sections of Portobello Road are done, as part of its Annual Plan process.  Under the current plan, work is being carried out in disconnected, piecemeal fashion with the final connection to the city left to the end.  Given that this final stretch of road between Glenfalloch and Vauxhall has the most traffic, the highest speeds, the most accidents, the greatest number of cyclists, and no shoulder whatsoever, we believe that DCC has the priority all wrong for safeguarding cyclists.  You can help shift the first priority to completing the most dangerous section, Vauxhall to Glenfalloch.  Click here to take action now!  Deadline for submissions is 5pm on Tuesday 15th April 2014.

SPOKES DUNEDIN FULL SUBMISSION ON DRAFT ANNUAL PLAN 2014/15

SPOKES Dunedin works to make Dunedin’s streets sweet for bikes, speaking out for cycling and representing those who ride a bike or would like to ride a bike in our city.  SPOKES wants cycling in Dunedin to be safe, practical and fun, and a viable transportation option for more residents.  Please see www.spokesdunedin.org.nz for more information about SPOKES, an incorporated society registered under the Incorporated Societies Act 1908.  SPOKES Dunedin is part of a nationwide network of local cycling advocacy groups that constitute the Cycling Advocates Network (CAN).  See www.can.org.nz for more information about CAN.

This submission is focused on three topics:

  1. The proposed ordering of widening work on Portobello Road
  2. The implementation of the Strategic Cycle Network
  3. Cycling as economic development

1. Portobello Road

The ordering of works for the Portobello Road widening project requires the careful consideration of many competing factors.  There are valid reasons for choosing different ordering options, and the choice is not easy.

The optimal solution would bring forward the overall completion date by several years and we discuss below several economic factors that favour expedited completion though we recognise existing fiscal constraints.

Of the options provided in the draft Annual Plan, our position is closest to Option B.  However, we wish to propose an alternative ordering option, that attempts to find a compromise position between competing interests based on what we identify as the highest priority areas.  We suggest:

  1. Vauxhall (Burns Point) to Glenfalloch (section A in all given options)
  2. King George Street to Bacon Street in Broad Bay (identified as section C2a in Option A)
  3. Portobello Village (identified as section C2b in Option A)
  4. Company Bay to Broad Bay (section B in all given options)
  5. Broad Bay to Portobello connector (identified as section C5 in Option A)
  6. Portobello (Weir Road) to Harwood turnoff (identified as section D in all given options)
  7. Otakou Golf Course to Otakou Fisheries

There are a number of reasons behind our suggested ordering and we set these out here.

Portobello Road was not designed or constructed to accommodate the speed and volume of vehicular traffic seen today, and as a result it presents significant hazards for all users.  It is particularly unfriendly to humans outside the confines of a protective steel cage.  The road widening project will not only transform the Peninsula for those who are fortunate enough to live there, but everyone in Dunedin will be able to experience and enjoy what is one of the jewels of our city. Furthermore, it will attract new tourists to explore this significant natural asset of Dunedin.

There is almost universal eagerness to complete this project, but we acknowledge that there are differences in preferred ordering, with most people living on the Peninsula wanting their section completed first while much of the rest of the city wants safe walking and cycling access from the city outwards.  There are strong reasons for prioritizing different sections, but we find that the strongest arguments favour Vauxhall to Glenfalloch as the top priority.

From Vauxhall to Glenfalloch the number of cars per day is more than twice the number of cars passing through Broad Bay (more than 5000 vs. ~2500), and being the straightest stretch of road, vehicle speeds are typically much higher.  It is not uncommon to see people driving in excess of 80kph between Glenfalloch and Burns Point, often dangerously passing cyclists when there is oncoming traffic.  If a car hits a cyclist in this situation, even while traveling in the same direction, the probability of death (see Figure A) is significantly higher than for a cyclist/vehicle collision elsewhere on the Peninsula where speeds are moderated by curves.

speed_fatality_graph.gif

Figure A: likelihood of cyclist/pedestrian fatality when struck by a vehicle travelling at different speeds.

The high number of accidents that have occurred between Vauxhall and Glenfalloch over the last five years bears out the dangers posed by higher vehicle speeds and more dangerous driver behaviour along this portion of Portobello Road in particular.  Although this stretch only accounts for 18% of the route subject to improvements, it has hosted a largely disproportionate 38% of accidents along the same length of Portobello Road.  Unlike the Broad Bay and Portobello communities, Vauxhall to Glenfalloch features neither footpaths or widened shoulders, nor alternative routes (e.g. Beaconsfield Road in Portobello).

In addition to the largest amount of vehicular traffic, the Vauxhall to Glenfalloch section also sees the largest number of cyclists on Portobello Road.  There are a large number of existing users who cycle from the city as far as Macandrew Bay – a distance from the city centre that can fit into a lunch hour, or a moderate distance for weekend cyclists.  Furthermore it can be expected that the Vauxhall to Glenfalloch section will comparatively see the largest increases in user numbers once complete.  According to studies commissioned by Dunedin City Council, the largest projected increases (see Figure B) for cycling are in the commuter and “recreational” categories (“recreational” has been distinguished from existing recreational “Roadie” and “MTB” cyclists to imply less confident cyclists, families, and tourists).

A significant percentage of cyclists in the “Roadie” “MTB” and “Recreational” categories come from other parts of the city to cycle on the Peninsula, and the density of cyclists will increase with proximity to the city centre as it currently does.  The uptake in “Recreational” cycling is therefore predicated on completion of the connection to Vauxhall.Portobello_Projections.png

Figure B: Projected weekly use by cyclists

Uptake in commuter cycling is obviously predicated on completion of the city connection, but it can also be expected that people living closer to the city centre are more likely to start commuting by bike than those further out.  In other words, there will be more people cycle commuting from the area between Macandrew Bay to Vauxhall than there will be cycle commuters coming from beyond Macandrew/Company Bay.  Thus commuters also contribute to a higher density of cyclists between Glenfalloch and Vauxhall.

The category “Local cyclists” includes school children and people getting around their own neighborhood by bicycle.  This is a smaller demographic with smaller projected increases.  While creating better walking and cycling access for school children is an admirable goal, the situation for Macandrew Bay has become that those children can walk or cycle to school until they are about 11, but then what?  With the connection to Vauxhall and the Strategic Cycle Network it becomes possible for those students to cycle to schools in the city.

The Portobello Road improvements have to date been fragmented and poorly integrated, thereby limiting their benefits almost exclusively to local residents. For example, the shared path for cyclists and pedestrians on the section of Portobello Road between Glenfalloch and Company Bay does little to assist commuters, “roadies” and recreational cyclists who are travelling from one end of the Peninsula to the other. When travelling from north to south cyclists would need to twice cross traffic flowing in both directions if they wished to take advantage of this brief length of separated cycling infrastructure. In our view having to undertake such a risky and difficult manoeuvre would negate any increased safety benefit from being able to use this segment of shared path. And when travelling from south to north along Portobello Road the current separated shared path is too narrow to comfortably accommodate both cyclists and pedestrians at peak use, no doubt due to the need to maintain sufficient space for cyclists travelling on the other side of the road. If the widening of Portobello Road is to continue in such a piecemeal fashion then interim improvements may have little benefit to the majority of cyclists already using this route, as well as to the majority of cyclists expected to make use of this route in the future (see Figure B above). For most residents and visitors to Dunedin connectivity along the whole route will be a primary issue, and connectivity will clearly favour the prioritisation of widening Portobello Road from Vauxhall outwards.

Nevertheless, we recognise the significant interest of the residents of the Peninsula in having their own local segments prioritised as well. Anecdotally, local economic benefits gained by Macandrew Bay since improvements to its segment of Portobello Road have been raised with Spokes by residents, as have the interests of parents in having safe routes for their children to get to and from school on their own. We also note the higher rate of accidents that have occurred between Broad Bay and Portobello Village in spite of the lower traffic volumes and speeds along this stretch. For this reason we ask that Council take a balanced approach by revisiting the ordering for road improvements along Portobello Road and ensuring that the most dangerous stretch of road (Vauxhall to Glenfalloch) as well as overall connectivity is prioritised from the City end, but at the same time addressing the particular interests of locals.

Most of the stretch of Portobello Road from King George St to Bacon St through Broad Bay is actually serviced by a footpath or widened shoulder, although coverage is not complete.  However, the sections of Portobello Road lacking a footpath have parallel access via either Greig Street or Margate Avenue.  There are no planned road improvements between Sandpiper Street and Bacon Street, so access to Broad Bay school will continue to be almost exclusively via Greig Street and Margate Avenue.  Thus although this section is of high priority for the Broad Bay community, it seems to be more for the amenity value rather than to address immediate safety concerns.  We note that residents between Vauxhall and Glenfalloch not only completely lack footpaths or widened shoulders (except for one ~25m stretch of footpath near Irvine Road), but also suffer substantially higher traffic volumes and speeds.

Portobello Village will also ultimately benefit from the proposed roadworks, but Portobello Village also has the advantage of existing connectivity via alternative roads such as Beaconsfield and McAuley Roads, an already widened shoulder on Portobello Road, and several existing footpaths including an off-road footpath to the school.  Most importantly, because the Portobello community has rejected any widening or boardwalk between the Portobello Boat Club and the cannon, modifications to the existing off-road footpath from the cannon to the intersection with Hereweka Street represents an amenity improvement rather than a substantial safety improvement. Because of the disconnection between Portobello Boat Club and the cannon, children going to school will likely have to continue using either Beaconsfield or McAuley Roads.  There are no planned additional improvements between Hereweka Street and Portobello school.

We ask that Council adopts our proposed ordering as a compromise position between the interests of Peninsula residents and the interests of Dunedin as a whole.

Beyond the question of ordering, we also wish to submit as to why the overall Portobello Road improvement project should be expedited. Cycle tourism in particular should be a highly motivating factor for Dunedin. The Central Otago Rail Trail contributes roughly $12 million per year to the economy of Central Otago and has been a veritable lifeline for Central Otago communities.  Meanwhile, the Otago Peninsula has been repeated recognised as one of the world’s top ten bicycle rides by leading travel guide Lonely Planet.  However, its position in this Lonely Planet listing has slipped from number one in 2009 to only number eight by 2012. To maintain the Peninsula’s brand as a world-class cycling destination and fully realize the potential economic benefits of such a valuable tourism asset requires accessible infrastructure to be in place along the entire Peninsula.  As a must-do activity in Dunedin, cycling the Otago Peninsula is an activity that could extend a visitor’s stay by several days. Thus there is a definite opportunity cost associated to a longer completion date.  If the Rail Trail is any indication, that opportunity cost could be as much as $10 million per year.

2.  The implementation of the Strategic Cycle Network

SPOKES is supportive of the goals of the Strategic Cycle Network.  The April 1st Infrastructure Services Committee report providing an update to the SH1 cycleways project mentioned the Central CIty as the next phase of the Strategic Cycle Network.  SPOKES Dunedin strongly believes that the winning strategy for cycling infrastructure development  is to improve and enhance the routes that people are already choosing to use.  Figure C shows a ‘heat map’ of cycling in Dunedin which indicates that existing users are drawn to primary corridors.  We call on the Council to adopt a winning strategy for cycling infrastructure by placing priority on the most popular routes.

HeatMap.png

Figure C: ‘Heatmap’ of cyclist’s most used routes in central Dunedin

It has been at times challenging to work with the Council on the South Dunedin part of the Strategic Cycle Network.  SPOKES wants to see logical and desirable route choices, and treatments appropriate to the on-street environment for each route.

A lot has been made of putting ‘‘Quiet Streets” in the South Dunedin packages.  A city might opt for Quiet Streets because they are a relatively low-cost investment, don’t interfere with on-street parking, usually get a decent level of buy-in from residents on the proposed routes, and let the city claim that it is ‘doing something’ for cycling.  But Quiet Streets on their own are unlikely to foment the mode shift that will justify future cycling-specific investment and should be understood as only part of a network that must also include high-level treatments on primary routes.

Copenhagen in Denmark is now a cycling success story, but in the late 1970s cycling mode share was less than 10%.  It wasn’t until “Copenhagen lanes” were built in the mid 80s that cycling really started to take off.  Before trying the Copenhagen lanes, Copenhagen first tried the ‘send the cyclists on the quiet back streets’ approach.  The result was abject failure.  Those already cycling continued using the direct and efficient main roads, while those who weren’t already cycling didn’t start.

With less than 10% commute-to-work mode share, Portland, Oregon in the United States is still decades behind Copenhagen but is a rising cycling star in the USA.  There, Quiet Streets are successfully used in Portland’s sprawling suburbs, where a grid system provides parallel sets of roads that allow straight, non-stop routes of 25 city blocks or more.  But more appropriate infrastructure on primary routes in the city centre has been in place for a number of years.  The newer Quiet Streets, comprising 10% of the total network, connect to these existing paths, cycleways, and lanes.

In Dunedin, the main roads are the only roads that connect to other parts of town.  In areas where we have a grid the grid is small, meaning a cyclist will only be able to go a few blocks before having to make a diversion or encountering a major obstacle.

Lastly comes the question of whether Quiet Streets will get more people on bikes.  Thirty years ago, Copenhagen found that people wanted physically protected cycleways on direct routes.  Last year, Dunedin City Council surveyed 503 people from across Dunedin about cycling infrastructure.  The results show that about 60% of respondents agree that separated cycleways would encourage them to cycle more, compared with only 40% for Quiet Streets.  In addition, 74% of respondents agree that the city should spend money on separated cycleways, compared with 52% for Quiet Streets.  There was broad support for the idea that separated cycleways on primary routes would be better for both cyclists and motorists, and that this is something the city should spend money on.

Cycle advocates know that “if we build it they will come,” but if we build the wrong thing they might not come.  In a world of tight fiscal constraints, building it and having them not come could set back cycling objectives for decades.  Quiet Streets must be used with caution; without connecting to high-level treatments on primary routes they will remain hidden away – out of sight, out of mind, and unused.  The Danes realized more than thirty years ago what is still true today: separated cycleways on primary routes are the gold standard.

3. Cycling as economic development

As part of the Economic Development Strategy, one of Dunedin’s key goals is to attract and retain world class, talented entrepreneurs and innovators who are able to contribute to the City’s economic development.  In this increasingly mobile and global workforce, livability and lifestyle are important factors in attracting talented people who have the freedom to live and work virtually anywhere. Technology giants such as Amazon, Google, and Foursquare have picked up on this and intentionally locate their offices in areas with good cycling infrastructure as part of their documented hiring and retention strategy.  Google headquarters even maintains its own fleet of over 1000 bicycles.

SPOKES Dunedin hosted a webinar by Denver CEO Kelly Brough on 20 November 2013 where she explained that Denver is actively investing in cycling infrastructure to specifically attract these kinds of high value-added companies.  This reflects a larger, widely recognized and well studied, demographic shift over the past 10 or 15 years as Generation Y and Millennials have entered the workforce. In deciding on today’s infrastructure priorities for Dunedin it is necessary to look beyond the status quo and reflect on demographic changes and trends that can help us become more competitive on the global market. Completion of the Portobello Road widening would make a valuable contribution to the overall livability and lifestyle choices available to Dunedin, and is worthy of high priority from Council and a quicker timeline for completion.

The Economic Development Strategy also has a target of $10,000 additional income in each resident’s pocket.  Cycling can play a key role in this and we wish to raise the value of better cycling infrastructure to Dunedin’s economy through cost savings as a motivating factor for expedited cycling infrastructure projects in the city.  We conservatively estimate that a 10% mode shift from personal vehicles to bicycles would result in roughly $9 million being retained annually by Dunedin’s economy. Currently, these $9 million are leaving New Zealand’s economy as payments that go overseas.  Please see Appendix A for details.  Cost savings such as these are another reason for expediting the work on the Portobello Road widening.

We wish to speak to this submission and look forward to discussing our submission with our Councillors.

Robert Thompson, Chair

SPOKES Dunedin

Appendix A: Cycling and fuel costs in Dunedin

Mode shift to cycling may be expected to come predominantly from the personal transportation sector, and it is sufficient to consider just the petrol costs. Although there are personal diesel vehicles, these may be roughly balanced by the fleet of petrol-driven commercial vehicles, so we may assume that, in Dunedin, diesel consumption is solely for commercial haulage and farming while petrol is solely for personal transportation.

The DCC’s recently released energy strategy estimates Dunedin’s expenditures on petrol at $203 million per annum. A breakdown of the cost of petrol is shown in the Figure. This graph shows that 41% of petrol costs are fuel excise taxes, GST, and emissions trading scheme levy. About 45% of the cost of fuel, $0.45 of every dollar or about $90 million per year for Dunedin, is the raw cost of petrol. This represents a $90 million per year drain on Dunedin’s economy that does not get returned in any form, for example through the National Land Transport Programme (NLTP). Since this money goes overseas, it is not only a drain on Dunedin’s economy but is a drain on the entire economy of New Zealand.  For every 10% shift from cars to cycling or walking for personal transport, Dunedin would save $9 million per year that would otherwise end up overseas.

petrolcost.jpg

Note that although New Zealand is an oil producer, the oil produced in New Zealand is generally not fuel-grade, and 85% of total domestic production is exported. Overall, domestic production accounts for less than 3% of total domestic consumption and is not refined as petrol, so it is fair to say that the entire raw cost of petrol ends up overseas. Money not spent on petrol is available to be spent in the local economy.

Note that about 24% of petrol cost, $48 million per year for Dunedin, goes into the NLTP, some (but not all) of which comes back to Dunedin through transport subsidies. Thus a 10% mode shift would reduce Dunedin’s contribution to the NLTP by $4.8 million per year.  However, the regional distribution of the NLTP is not strictly correlated to contributions, so it does not follow that a $4.8 million per year reduction in contributions to the NLTP would result in any reduction in NLTP transport subsidy to Dunedin.

This is a basic and rough examination of fuel costs alone.  Myriad substantial costs related to fleet replacement and maintenance have not been included.